In January 2012 Sydney Harbour Bridge is being resurfaced. Naturally I am interested.
The work is taking place over two weekends, or possibly three, depending on the weather. It is the first time in the Bridge’s 80-year history that the asphalt has been stripped back to the original concrete deck. Workers with small paint rollers on sticks will waterproof the deck with epoxy and large machines will lay a smooth asphalt surface over it. More about this on the NSW Government’s Transport website.
There were long traffic queues and cranky drivers on the first weekend as cars were diverted into the Harbour Tunnel. Presumably many people had not seen the mobile traffic signs and the advertisements that had been warning for months that the Bridge would be closed.  This weekend, after all the publicity about the delays last week, you’d think people would have got the message to take a longer route to cross the harbour. But apparently not, according to the Sydney Morning Herald. There were queues again today.
On Friday afternoon I drove over the Bridge some hours before it closed at 10.00 pm. My passenger took photos. To the left of the picture an electronic sign warns that the Bridge will be closed tonight. To the right you can see Lanes 1-3 have been newly resurfaced. The patchy asphalt on Lanes 4-6 is covered in graffiti for the instruction of the workers who will shortly be ripping it up.